Breadcrumb
- Home (ITA-CRO)
- Projects (ITA-CRO)
- Docs&Tools
DOCS & TOOLS
DOCS & TOOLS
Asset Publisher
Asset Publisher
In this section you can find all the deliverables produced by STREAM
3.1_Report of the Progress in Creating Flood Risk Cadaster (D.3.1.1)
PUBLISHED ON 29/12/2022
3.1_Maps showing flood cadaster, flood-prone areas and related spatial information developed (D.3.1.3)
PUBLISHED ON 28/08/2023
3.4 International Flood platform based on free and Open Source Software created (D.3.4.2)
PUBLISHED ON 26/10/2023
3.3 Report of the progress on FRMP updating in Italy (D.3.3.2)
PUBLISHED ON 30/08/2023
3.2 Flood risk and flood hazard maps for Zadar, Split, Metković, Poreč, Gospić i Biograd na Moru area in Croatia developed (D 3.2.1)
PUBLISHED ON 30/08/2023
4.4 3300 booklets for children developed and printed (D.4.4.7.)
PUBLISHED ON 26/10/2023
4.3 WEB App for territory data monitoring and reporting developed (D.4.3.2)
PUBLISHED ON 26/10/2023
4.4 STREAM Guidelines for modelling for pilot sites in order to create a flood forecasting system (D 4.1.1)
PUBLISHED ON 26/10/2023
4.1 One probabilistic model designed for a better understanding of the pluvial floods, their prediction and promptness in reactions of the urgent services (D 4.1.3)
PUBLISHED ON 30/08/2023
4.2 Radio-communication system in Zadar county improved (D.4.2.1)
PUBLISHED ON 18/08/2023
4.2 Carried out five (5) training seminars on how to use new technology (D.4.2.4)
PUBLISHED ON 26/10/2023
4.2 Performed 1 Equipment and System testing in KAZUP - Performed one (1) equipment and system testing in Karlovac County (D.4.2.5)
PUBLISHED ON 04/09/2023
4.4 Drills urgent services education about FRMP and EWS in IT (100 people) and HR (150 people) carried out (D.4.4.2)
PUBLISHED ON 06/09/2023
4.4 Local government education about EWSs, FRM (flood alert systems, forecast uncertainty information, sustainable urban drainage system) in IT (150 people) and in HR (100 people)
carried out (D 4.4.3)
PUBLISHED ON 06/09/2023
4.4 Civil Protection volunteers in IT (150) and HR (100) trained (D 4.4.4)
PUBLISHED ON 06/09/2023
4.4 Scholar education in IT (200) and in HR (100) carried out (D 4.4.5)
PUBLISHED ON 06/09/2023
5.1 Integrated river forecasting system with the ocean on case studies (D.5.1.2)
PUBLISHED ON 26/10/2023
5.1 Videocameras and soil moisture sensors, integrated with the regional meteo-hydro monitoring network: testing and recording data (D.5.1.3)
PUBLISHED ON 26/10/2023
5.1 Flow measurements and stage discharge relationships for model
calibration (D.5.1.4)
PUBLISHED ON 26/10/2023
5.1 Nowcasting and weather radar products developed and in real-time implemented (D.5.1.5)
PUBLISHED ON 26/10/2023
5.2 Probabilistic EWS for coastal risk implemented and tested on at least one location along the Emilia-Romagna coast (D.5.2.1)
PUBLISHED ON 26/10/2023
5.2_Webcams and 1 tide gauges station implemented, tested and data recorded (D.5.2.2)
PUBLISHED ON 26/10/2023
5.2_Civil protection exercise for river and coastal risk organised and realised (D.5.2.3)
PUBLISHED ON 26/10/2023
5.3 One multi-model flood forecasting system for the Po Delta region developed (D.5.3.1.)
PUBLISHED ON 26/10/2023
5.4_Real_Time_Monitoring_System_and_Early_Warning_System (D.5.4.3)
PUBLISHED ON 26/10/2023
5.5. Each pilot watersheds: meteo- hydrological - ocean modelling upgraded with focus on interactions in the coastal areas (D 5.5.1)
PUBLISHED ON 26/10/2023
5.5 One sea level station and one hydrometer/meteo installed (D 5.5.3)
PUBLISHED ON 26/10/2023
5.5 Assessment of impacts of coastal flooding on coastal urban areas and on coastal erosion developed (D 5.5.4)
PUBLISHED ON 26/10/2023
5.6 Early warning system (RTC) in the most significant discharge points (D.5.6.2)
PUBLISHED ON 26/10/2023
5.6 Technical guidelines for Green Infrastructure Modelling (D.5.6.3)
PUBLISHED ON 26/10/2023
5.7_Dubrovnik Flood monitoring and risk prevention centre developed (D.5.7.4)
PUBLISHED ON 22/08/2023
5.7_Equipment for urgent services in Poreč-Parenzo purchased (D.5.7.5)
PUBLISHED ON 22/08/2023
5.7_Five training drills for innovative and adequate equipment testing organized (D.5.7.6.)
PUBLISHED ON 22/08/2023
5.8_Smart urban drainage system in Zadar implemented (D.5.8.1)
PUBLISHED ON 22/08/2023
5.8 Smart urban drainage system in Biograd na Moru implemented (D.5.8.2)
PUBLISHED ON 22/08/2023
5.8 Infrastructure documentation for the smart urban drainage system(s) in Poreč-Parenzo developed (D 5.8.3)
PUBLISHED ON 06/09/2023
5.8 Infrastructure documentation for smart urban drainage system in Zadar implemented (D 5.8.4)
PUBLISHED ON 06/09/2023
5.9_Complex flood interventions command post established (D.5.9.1)
PUBLISHED ON 22/08/2023
5.9_One standard operating procedure for flood interventions (D 5.9.2.)
PUBLISHED ON 22/08/2023
5.9_One exercise of the civil protection operational forces performed (D 5.9.4.)